- Home
- Living Here
- Roads and Transportation
Roads and Transportation
All Hanover County public roads and bridges (outside of the Town of Ashland) are operated and maintained by the Virginia Department of Transportation. VDOT also maintains roadside ditches, performs snow removal functions and builds new roads with money allocated by the Commonwealth Transportation Board.
On VDOT’s Work Request page you can submit a request to have a road repaired, to remove something from a road, to have signs or traffic devices repaired, to request new signs or traffic devices, to submit a claim or to ask for more information. This page can also be used to submit snow plowing-related complaints.
Problems with VDOT roads can be reported to their Customer Service Center at 1-800-367-7623 around the clock. TTY users can call 711.
If you have a unique road or drainage problem or other questions and need help determining the appropriate agency contact, you can call the Hanover County Department of Public Works at 804-365-6181 and they will help you.
County-Administered Road Projects
- Atlee Station Road Widening (Phase 2)
Estimated Cost: $30.7M
Estimated Completion: 2028
Project Manager: Joe Vidunas; 804-365-6176; jevidunas@hanovercounty.gov
- 10% Plan Development
- Citizen Information Meeting (5-4-22)
- 30% Plan (9-27-22) (PDF)
- 60% Plan (3-31-23) (PDF)
- Cool Spring Elementary School Pedestrian Improvement
Estimated Cost: $253.7K
Estimated Completion: 2027
Project Manager: Ross Ward, PE; 804-365-3425; raward@hanovercounty.gov
- Creighton Road/Creighton Parkway/Walnut Grove Road Roundabout
Estimated Cost: $6.4M
Estimated Completion: 2028
Project Manager: Lindsay Davis; 804-365-3266; ledavis@hanovercounty.gov - Lewistown Road / Ashcake Road Intersection Improvement
Estimated Cost: $5.7M
Estimated Completion: 2026
Project Manager: Scott Kramer, PE; 804-365-7188; sekramer@hanovercounty.gov
- Location Map (PDF)
- Preferred Alternative (PDF)
- Citizen Information Meeting (9/26/22)
- 30% Plan (11-11-22) (PDF)
- 60% Plan (3-03-23) (PDF)
- 60% Project Sketch (PDF)
- Mattaponi Road Paper Streets Paving
Completed Cost: $16,460
Construction Completed: July 11, 2022
Project Manager: Ross Ward, PE; 804-365-3425; raward@hanovercounty.gov
- Pole Green Road Widening
Estimated Cost: $26.3M
Estimated Completion: 2029
Project Manager: Joe Vidunas; 804-365-6176; jevidunas@hanovercounty.gov
- Citizen Information Meeting (10-27-20)
- 30% Plan (9-2-21) (PDF)
- Citizen Information Meeting (9-13-21)
- 60% Plan (3-3-22) (PDF)
- Public Hearing (4-25-22)
- Citizen Information Meeting (5-9-23)
- Route 1/30 Traffic Signal Improvement
Estimated Cost: $2.077M
Estimated Completion: 2026
Project Manager: Nicole Onellion, EIT; 804-365-6156; nronellion@hanovercounty.gov
- Project Rendering (PDF)
- Citizen Information Meeting (9/22/22)
- 30% Plan (9-9-22) (PDF)
- Memo - Intersection Configuration (2-7-23) (PDF)
- Traffic Signal Preliminary Layout (1-17-23) (PDF)
- Route 301 Additional 3rd Southbound Lane
Estimated Cost: $906,000
Estimated Completion: Summer 2024
Project Manager: Joe Vidunas; 804-365-6176; jevidunas@hanovercounty.gov
- Route 301/Route 54 Roundabout
Estimated Cost: $3.8M
Estimated Completion: 2027
Project Manager: Lindsay Davis; 804-365-3266; ledavis@hanovercounty.gov
- Route 360 / Lee Davis Road Widening
Estimated Cost: $33.8M
Estimated Completion: 2025
Project Manager: Joe Vidunas; 804-365-6176; jevidunas@hanovercounty.gov
- Route 360 Bus. / Atlee Road / Cold Harbor Road Intersection Improvement
Estimated Cost: $6.5M
Estimated Completion: 2026
Project Manager: Jared Cornwell, EIT; 804-365-6834; jbcornwell@hanovercounty.gov
- Location Map (PDF)
- Preferred Alternative
- Citizen Information Meeting (CIM) (9-19-22)
- 40% Plan (11-11-22) (PDF)
- Rural Roads - Shoulder Widening & Pavement Overlay
Estimated Cost: $350K/Mile; $3.5M/Year
Estimated Completion:- Goddins HIll Rd./Mt. Hermon Rd./Sliding Hill Rd. - April 30, 2023
- Cool Spring Rd. - Summer 2023
- Winns Church Rd. - Summer 2023
- Rural Point Rd. - TBD
- McClellan Rd./Rockhill Rd./Market Rd. - TBD
- Old Ridge Rd. - TBD
Project Manager: Ross Ward, PE; 804-365-3425; raward@hanovercounty.gov
- First Year "Pilot" Projects Overview & Location Maps (PDF)
- Second Round Projects Overview & Location Maps (PDF)
- Sliding Hill / New Ashcake Road Signalized Continuous Green-T Intersection Improvement
Estimated Cost: $694.0K
Construction Completed: Summer 2022
Project Manager: Randy Hardman, PE; 804-365-6376; wrhardman@hanovercounty.gov - Sliding Hill Road Widening Pedestrian Improvement
Estimated Cost: $413.5K
Estimated Completion: Summer 2023
Project Manager: Randy Hardman, PE; 804-365-6376; wrhardman@hanovercounty.gov
Following the completion of the Sliding Hill Road widening project in December 2020, VDOT and FHWA directed the County to make certain pedestrian modifications and improvements as detailed in the linked plan set. Construction is planned in 2022 once all necessary right-of-way and easements have been acquired.
Quick Links
- Quarterly Road Project Status Report
- 2021 Candidate (Road) Project List (PDF)
- Hanover Road Project Funding Plan (Adopted 10-13-21)
- 2013 Transportation Policy (Adopted 5-22-13) (PDF)
- 2016 Business and Residential Development Road Improvements Transportation Policy (Adopted 6-27-16) (PDF)
- Richmond Region Projects (VDOT Listing)
- Richmond Regional TPO Long Range Transportation Plan (LRTP)
- Secondary Six-Year Plan (SSYP)
- Transportation Improvement Program (TIP)
- VDOT Resurfacing and Pavement Information
- 2023 Pavement Resurfacing Schedule (Hanover)
- 2022 Pavement Resurfacing Schedule (Hanover)
- 2021 Pavement Resurfacing Schedule (Hanover)
- Cape Seal Project Example
-
J. Michael Flagg
DirectorPhone: 804-365-6181
-
Public Works
Physical Address
7516 County Complex Road
Hanover, VA 23069
Phone: 804-365-6181
Hours
Monday - Friday
8:30 AM - 5:00 PM